g-2 Ring Injection Kicker Step Response

Document #:
Beams-doc-6037-v1
Document type:
Note
Submitted by:
Dennis Barak
Updated by:
Dennis Barak
Document Created:
18 Jan 2018, 17:09
Contents Revised:
19 Jan 2018, 09:54
Metadata Revised:
19 Jan 2018, 09:54
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
Given the uncertainty in the expected rise time of the G-2 injection kickers, we made a measurement of the rise time using a fast, low impedance pulse generator, a 12.5 ohm resistor to mimic the impedance of the Blumlein and coax cables, the 12.5 ohm Bazooka that is the terminating resistor for the Blumlein, and the kicker structure in kicker #3.