These are meeting minutes and slides.
The meeting was called as a startup for the PIP-II Machine Protection System (MPS) specification and design effort. In this meeting Craig Drennan showed some system block diagrams of his interpretation of the existing Functional Requirements for the MPS, last revised August 2015, and diagrams that elaborate on a proposed topology for beam instrumentation electronics involved with the MPS.