Moving the Interlocked Gate Near Downstream End of Main Ring F-sector Upstream

Document #:
Beams-doc-7064-v1
Document type:
Note
Submitted by:
Gordon M. Koizumi
Updated by:
Gordon M. Koizumi
Document Created:
13 Mar 2019, 17:12
Contents Revised:
13 Mar 2019, 17:12
Metadata Revised:
22 Mar 2019, 13:15
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
A study was made to determine if it was practical to move the location of the interlocked gate separating Switchyard Transfer Hall from most of F-Sector tunnel in the Main Ring to a spot further upstream in F-Sector. It was hoped that this would allow greater access to F-Sector with beam in the Main Injector. From a radiation safety perspective, it was possible to move upstream a large distance. However, the existing configuration of power distribution system made making this change difficult operationally or very expensive. The conclusion reached was that it was NOT practical to move this gate upstream from its present location.
Files in Document:
  • pdf (Moving the Interlocked Gate Near Downstream End of Mai...pdf, 275.2 kB)