Beams Document 7718-v3

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Making Room for PIP-II in F-sector

Document #:
Beams-doc-7718-v3
Document type:
Talk
Submitted by:
Adam Watts
Updated by:
Adam Watts
Document Created:
10 Oct 2019, 14:02
Contents Revised:
09 Dec 2019, 20:21
Metadata Revised:
09 Dec 2019, 20:21
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-7718-v2
14 Oct 2019, 14:21
Beams-doc-7718-v1
10 Oct 2019, 14:02
Abstract:
A plan is considered to modify the P3 beamline F37 half-cell to accommodate the PIP-II beamline and tunnel crossing through. By replacing each B1 and B2 dipole pair in the half-cell with appropriately-placed B3 magnets with coils wired in series configuration, >8m of space can be created for PIP-II without impacting the beam trajectory to Switchyard.
Files in Document:
Topics:
Authors:
Keywords:
main_ring
Notes and Changes:
Added CAD beamline drawings from Curtis Baffes and a punch-list of issues to address for the installation.