A plan is considered to modify the P3 beamline F37 half-cell to accommodate the PIP-II beamline and tunnel crossing through. By replacing each B1 and B2 dipole pair in the half-cell with appropriately-placed B3 magnets with coils wired in series configuration, >8m of space can be created for PIP-II without impacting the beam trajectory to Switchyard.