Beams Document 7908-v3

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

NuMI Veto Interrupts MicroBooNE Data

Document #:
Beams-doc-7908-v3
Document type:
Figure/Photo
Submitted by:
Alyssa R Miller
Updated by:
Alyssa R Miller
Document Created:
03 Jan 2020, 18:05
Contents Revised:
27 Mar 2020, 13:57
Metadata Revised:
27 Mar 2020, 13:57
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-7908-v2
27 Mar 2020, 13:53
Beams-doc-7908-v1
03 Jan 2020, 18:05
Abstract:
MicroBooNE has been unable to use $1Ds that are placed in specific sequence in the event timeline. This is due to the experiment's need to blind their hardware to NuMI beam, which is sometimes detectable simultaneously with BNB beam.

Collected here are drawings that show how this happens with TLG event timing, as well as how the MicroBooNE triggers and readout windows are configured.

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.10, contact Beams Document Database Administrators