Beams Document 859-v1
[
DocDB Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
] [
List Events
]
Booster cogging for multiple batch operation of the Main Injector
Document #:
Beams-doc-859-v1
Document type:
Talk
Submitted by:
Jean Slaughter
Updated by:
Robert M Zwaska
Document Created:
02 Oct 2003, 16:22
Contents Revised:
02 Oct 2003, 16:22
Metadata Revised:
02 Oct 2003, 16:48
Viewable by:
Public document
Modifiable by:
Same as Viewable by
Quick Links:
Latest Version
Abstract:
A talk on the progress and outlook of Booster cogging. Given at the Run II meeting. Cogging synchronizes the Booster notch with beam in the Main Injector, and is necessary for multiple batch operation.
Files in Document:
Cogging Plan and Operational Issues (DOC)
(Cogging Plan and Operational Issues.doc, 35.5 kB)
Cogging Plan and Operational Issues (PDF)
(Cogging Plan and Operational Issues.pdf, 25.2 kB)
PDF version
(Cogging_20031002c.pdf, 1.3 MB)
PPT version
(Cogging_20031002c.ppt, 1.2 MB)
Other Files:
Junk - Don't Use
(~$gging Plan and Operational Issues.doc, 162 bytes)
Topics:
NuMI
:
Primary Proton Beam
Booster
:
Projects
Booster
:
LLRF
NuMI
:
Commissioning
Booster
:
Studies
Main Injector
:
Project
Authors:
William A Pellico
Robert M Zwaska
Keywords:
booster
main_injector
rf
llrf
extraction
feedback
numi
[
DocDB Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
] [
List Events
]
DocDB
Version 8.8.10, contact
Beams Document Database Administrators