Pbar Running Conditions Checklist
Created
by Brian Drendel
This page organizes log book entries that document the Pbar running conditions prior to major shutdowns. The below table outlines which Pbar Elog chapters were used to document running conditions before any particular shutdown.
Fall 2007 Shutdown | Winter 2006 Shutdown | Fall 2004 Shutdown | Fall 2003 Shutdown |
|
|
2004 Pbar Elog Chapter #462 | 2003 Pbar elog Chapter #254 |
To help organize the large
quantity of data that were collected, the below index was created. The
index is organized by accelerators and beam lines. Within each
accelerator or beam line section are the individual items that were documented.
After each item listed on this page are links to the individual entries that
cover that particular item. Click on links labeled "Winter 2006" to
go the the results from the "Winter 2006" save, click on "Fall 2004" to go
to results from the 2004 save, or click on links labeled "Fall 2003" to go to
results from the Fall 2003 save. Sometime multiple elog entries were
made on a particular topic during one of the saves. In this case, I
reference each entry in the format (Fall 2004: entry 1, entry 2, entry 3,....).
Clicking on "entry 1", "entry 2" etc.. would bring up the individual entries.
If the particular topic was not documented before a shutdown on a certain
{Date}, there will be a tag that
says ({Date} ). Send comments and sugg
Click on the desired beam line or Accelerator to go to documentation specific to that section, or scroll down the page to view all of the documentation: